Red Hat
New member
I need some of our Instructors to chime in on this. I tried to contact SLED but wasn't able to get through to them. I was told that SLED increased the time frame for CWP Renewals from 90 days to 120 days prior to expiration. Is there any truth to this or just wishful thinking? I'm within the 120 day time frame and would like to get a jump on my renewal.
After doing some more checking I see that on the new renewal application it states: 2. (New and Renewal) ‐ Processing time may be 90 days. A renewal should be mailed 90 ‐ 120 days before permit’s expiration. Link Removed
However, on the online renewal site it states it can't be over 90 days. Link Removed
After doing some more checking I see that on the new renewal application it states: 2. (New and Renewal) ‐ Processing time may be 90 days. A renewal should be mailed 90 ‐ 120 days before permit’s expiration. Link Removed
However, on the online renewal site it states it can't be over 90 days. Link Removed